
2008 meeting dates: TBA
| Links | Size |
|---|---|
| 189.2 KB | |
| 179.25 KB | |
| 131.82 KB |
| Links | Size |
|---|---|
| 256.24 KB | |
| 22.23 KB | |
| 7.82 KB |
The start - Wrench Construction on the jobsite
Auger cast piling being placed
Drill rig in place for auger cast piling
Formed and ready to pour the first pad for the base of the dam
1st pour of base of Marsh Creek dam
Pouring the second half of the dam base
Both abutments poured and forming for the main dam wall
Forming for installation of the water control structure
Main dam wall formed
The completed Marsh Creek Dam
Aerial of Gun Club after MBI completed
Aerial view of Gun Club initial drainage
JTWN recent acquisitions with wetland potential
JTWN recent acquisitions with wetland potential
TNC Cedar
Copyright © 2008 Kansas Alliance for Wetlands & Streams.
site design Sprout Software